Setup the Hausmate production test equipment as explained in  'Testing hardware - equipment setup'.


When testing the Relay Unit (RU) it must be plugged into socket 3 of the test Zone Gateway (ZG).


  1. 'Values' below can be checked using the 'Bench, sensors' page of the UI (User Interface - the HostPC's website)
  2. Scroll to the bottom of the UI Bench sensors page so that all of the 'Relays' section can be seen.
  3. Using at CAT5e or CAT6 patch cable, connect the Unit Under Test (UUT) socket 'skt1' to the ZG socket '3'
  4. LED7, the 'Power' LED should light as soon as the unit is plugged in. 
  5. Whilst watching the LEDs on the RU and listening to the relays 'clicking' on and off, click on the 'AUTO TEST button on the UI.
  6. Each LED should light in turn and a click f the relay turning on and off should be heard as the LED goes on and off.
  7. If all the LEDs light and relays click at the right times then mark the unit as having passed test buy writing the following on the 'serial no.' rectangle - yyyymm-nnn where yyyy is the current year, mm is the current month and nnn is the number of the UUT having passed test this month, (each product type starts at number 0 on the 1st of each month). Use a fine tip permanent marker pen e.g. Staedtler Lumocolour black fine pen Art 318-9 (EAN 40 07817 304563).
  8. Write on the yyyymm-nnn number of the UUT on the outside of the packing bag.
  9. Record on the 'Hausmate production test record sheet' the date, start time, end time, testers name, for each tester's session and the start number (nnn) and end number (nnn) for that session. A new sheet is required for each product, each month.
  10. If any unit fails any test then attach a label stating which part of the test failed e.g. 'Tamb, no temp', 'PIR, no change' and put the UUT in the fail bin for rework.